Electricity here runs 15.87 cents a kilowatt-hour
A heat pump in Boone County runs on electricity for both heating and cooling, so that rate applies to the system every month it operates, not just in summer.
Takes about a minute. No obligation.
A heat pump in Boone County runs on electricity for both heating and cooling, so that rate applies to the system every month it operates, not just in summer.
Two heat pumps pulling the same rate per kilowatt-hour can use very different amounts of power to heat or cool the same house. The one that does the job with less electricity is the one worth paying attention to at this price.

NOAA nClimDiv, 1991–2020 normals
Half the homes in Boone County were built in 1960 or earlier.
A heat pump sized for a newer house won't match one of these.




Boone County sits in climate zone 5A, a cool zone where heat matters more than cooling. That's why a new heat pump here answers to a federal floor on both: at least 14.3 Btu of cooling delivered per watt-hour over the summer, and at least 7.5 Btu of heat per watt-hour over the winter, for any split system built on or after January 1, 2023. In a zone where heating carries the bigger load, the winter number is the one worth asking about. That floor is a minimum, not a ceiling. A unit can clear it by a wide margin, and the ones that do are the ones that cost less to run through a Boone County winter.
That rate applies every month this system runs, all year. The efficiency rating on the unit going in is what decides how far it stretches. Worth settling before installation, not after.
Find a contractorHalf of Boone County's homes went up in 1960 or earlier. A heat pump sized off a load calculation for a newer build will run wrong here, short cycling in some rooms and starving others. Before install, have the contractor run a room by room load calculation on the actual house, not a square footage estimate. That number decides the size of the unit and the ductwork it needs to work with.
A heat pump's price covers more than the outdoor unit and the air handler. Line sets have to be run and sized right, the electrical circuit has to match what the compressor draws, and the ductwork has to move the air the system is designed to push. Skimping on any of those shows up later as a system that runs longer than it should to hit the same temperature.
A heat pump built for mild winters can get away with a simpler compressor and a basic defrost cycle. One that has to carry real heating load needs a variable speed or two stage compressor, a defrost control that doesn't waste cycles, and enough backup heat strip capacity for the coldest stretches. Those features cost more to build in, and they're the ones that decide whether the system struggles or keeps up.
If gas heat is already in place, the furnace usually stays. A heat pump handles most of the heating on its own and hands off to the furnace only when the outdoor temperature drops below what the heat pump can carry efficiently, so the two work as a pair rather than one replacing the other. The old furnace keeps its gas line and its spot in the system, it just runs less. What does get decommissioned is any equipment the heat pump makes redundant, like a separate air conditioning condenser, since the heat pump's outdoor unit now covers cooling too. A contractor can tell you during the load calculation whether your existing ductwork and furnace blower can support the added heat pump coil, since both systems will be moving air through the same ducts.
Installation starts with the outdoor unit and indoor coil, but most of the day goes to the connections between them. The line set gets run, brazed, and pressure tested before anyone opens a valve, since a leak found after the charge goes in means doing that step twice. The electrical circuit gets sized to the compressor and tied in, and if the furnace is staying in the system, the indoor coil gets set in the plenum above or beside it so both can share the same ductwork. Once everything is connected, the system gets evacuated to pull moisture and air out of the lines, then charged to the weight the manufacturer specifies, not just run until it feels cold. The last part is commissioning: checking airflow at the vents, confirming the thermostat is talking to both the heat pump and the furnace if there is one, and testing the defrost cycle so it only runs when frost is actually on the coil. A system that skips that last step can run fine for a while and still cost more than it should.