Most of Newton heats with gas
Utility gas heats 56% of occupied homes in Jasper County, with electricity and LP gas splitting most of the rest. A furnace paired with central air is still the setup most houses here already have in place.
Takes about a minute. No obligation.
Utility gas heats 56% of occupied homes in Jasper County, with electricity and LP gas splitting most of the rest. A furnace paired with central air is still the setup most houses here already have in place.
Install one and the home moves to electric heat for at least part of the year, or runs alongside the existing furnace as a second system. Either way it is a different setup than most neighbors have, worth sizing and pricing out as its own project rather than a straight swap.

NOAA nClimDiv, 1991–2020 normals
Heat here runs October through May, about eight months of the year.
A heat pump installed in September is sized and running before that first cold month arrives.




Jasper County sits in zone 5A, a cool climate where heating does most of the work over the year. That doesn't change what size heat pump your house needs. A unit sized to your square footage and insulation handles winters here the same way it handles winters anywhere else in this zone. Where the cold matters more is the backup. Overnight lows average 16°F across December, January and February, and most heat pumps lean on a secondary heat source once temperatures drop well below freezing. That's a furnace already in place for most homes here, not a reason to size the heat pump itself any bigger.
Replace it before the season starts, so it happens on your schedule, not in a hurry.
Find a contractorThat older half of the homes here, built 1965 or earlier, were built for the furnace already in them, not for a heat pump. Ductwork sized for a furnace's hot blast doesn't always move the lower, steadier airflow a heat pump puts out just as well. Before anything goes in, a contractor should check the ducts, the insulation and the electrical panel against the unit going in, not just the square footage. That's what fitting this to your house actually means.
A heat pump sized above what the house needs will short cycle, shutting off before it finishes a full heating or cooling run. That wears on the compressor and leaves rooms clammy in summer, since the unit never runs long enough to pull moisture out of the air. The right size runs longer, steadier cycles and holds a more even temperature room to room.
Sizing starts with a load calculation, not the square footage alone. A contractor works through the walls, the windows, the insulation, the ceiling height and which way the house faces, then adds up how much heat the house loses in winter and gains in summer. A house with more window area or thinner walls needs a different size than one without, even at the same floor plan. Skip this step and the unit is a guess dressed up as a number.
The unit itself is only part of what you're paying for. A heat pump install means running new refrigerant lines, setting an outdoor condenser on a pad, and tying in an air handler or working with the ductwork already there. If the ducts need modification to handle the airflow, that's labor and material before the heat pump even turns on. The electrical side matters too. Most panels need a dedicated circuit for a heat pump, and some older panels don't have the capacity without an upgrade. Efficiency rating plays into it as well, since a higher-efficiency unit costs more up front but uses less power to run. Backup heat is its own line item, whether that means keeping an existing furnace tied in or adding electric resistance coils to the air handler. None of this is optional dressing. It's what separates a unit that fits the house from one that just fits the budget.
Install day starts with the outdoor unit going on a pad or mounting bracket, level and far enough from the wall to pull air freely. Refrigerant lines run between that unit and the air handler, then get pressure tested before anything is charged. A leak is easier to find before the system is full of refrigerant than after. The electrical hookup usually means a dedicated circuit and a disconnect box within sight of the outdoor unit, so power can be cut right there during service. Once everything is connected, the system gets charged with refrigerant to the exact weight the manufacturer specifies, not just until it feels cold. The last part is commissioning, checking airflow at the vents, confirming the thermostat is talking to the right stages of heat, and making sure backup heat kicks in when it's supposed to and not before. A contractor walks through that with you before calling the job done, not after you've already noticed something's off.
